Ozwest Group’s team of installers and fabricators understated the scale of
works to be performed at the
Church house development for the internal glass balustrading.
An impressive overall look for the glass balustrading of flat segmented, heat soaked 21.23 mm Low iron toughened laminated glass & full surround polishing, most pieces weighing more than 120 kg each panel.
The use of satin finish - 50 mm stainless steel tube for the handrail & glass brackets welded, cut & polished on site to achieve a continuous flow to the extensive balustrading.
Lastly to complete the installation each glass segment was supported with round standoff components fitted through each glass panel and through the base stringer of the staircase.
The use of satin finish - 50 mm stainless steel tube for the handrail & glass brackets welded, cut & polished on site to achieve a continuous flow to the extensive balustrading.
Lastly to complete the installation each glass segment was supported with round standoff components fitted through each glass panel and through the base stringer of the staircase.
To accomplish such a project that showcases a magnificent glass balustrading staircase such as church house was an achievement that Ozwest Group regards an as 8 out 10 on the complexity scale and proudly places Church house as a project to be measured by.
Our Team produced a remarkable outcome with the use of meticulous planning and teamwork, as it showed that the coming together of a project that was both rewarding and gratifying Projection completion.